Home/Services/Commissioning
Service · 05

Commissioning of industrial equipment

Cold and hot commissioning, performance testing, operator training and documented handover of the installed equipment.

Overview

Commissioning is where an installation becomes a producing asset. We run the sequence in order: pre-commissioning checks and punch list closure, cold commissioning without process material, hot commissioning under load, then performance testing against the criteria written into the purchase order. Operators and maintenance staff are trained on the equipment they will run, in French or English, and the handover package contains the test records, the settings actually used and the maintenance plan — not a generic manual.

Typical Applications

  • Start-up of newly installed process equipment
  • Performance testing against contractual guarantees
  • Operator and maintenance training on new equipment
  • Re-commissioning after a major overhaul or relocation
Problems

Typical Problems We Solve

  • Equipment started without a formal test protocol, disputes follow
  • Performance guarantees never verified before the warranty lapses
  • Operators learning the equipment by trial and error after handover
  • Settings undocumented, so the unit cannot be restored after a stoppage
Deliverables

What You Receive

  • Pre-commissioning checklist and punch list closure record
  • Cold and hot commissioning reports
  • Performance test report against the agreed acceptance criteria
  • Training record, operating settings and maintenance plan
Timeline

Timeline

1 to 3 weeks on site depending on equipment complexity and test protocol.

Standards

Standards & Certifications

  • IEC 62337 — commissioning of process plants, milestone definitions
  • Manufacturer commissioning and acceptance test procedures
  • CSA Z460 — lockout during commissioning activities
  • Contractual performance guarantees stated in the purchase order
Industries

Industries We Serve

  • Mining — crushing, classification and dewatering circuits
  • Cement & Limestone — crushing and conveying lines
  • Energy — auxiliary systems and water treatment
  • Chemical & Petrochemical — separation and process units
FAQ

Service FAQ

What does a performance test actually verify?

Whatever the purchase order made contractual — throughput, product specification, moisture content, power draw, availability. If no acceptance criteria were written into the order, we say so before start-up and propose measurable ones, because a test without criteria settles nothing.

Is training included in commissioning?

Operator and first-line maintenance training is part of the standard commissioning scope, delivered on the equipment itself, in French or English. Deeper maintenance training can be added as a separate session.